Completed Projects
|
Project No
|
GTC/07/147/ED
|
|
Type
|
EPIC
|
|
Title
|
Engineering, Procurement, Installation and Commissioning of Desalinated Water Network
Phase II at Ras Laffan.
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
23/11/2009
|
|
Details
|
This EPIC Contract construction of site survey, topographic survey, detailed design
& engineering, procurement of materials such as MOV PCV, manual valves, electrical
& instrumentation materials, civil works such as temporary facilities, leveling
/ grading, pipeline trench; construction of valve chamber, microtunneling , product
corridor crossing, pipeline crossing, pipeline installation, instrumentation & control
installation, testing of electrical & instrumentation / control systems, sterilization
of pipeline, precommissioning and commissioning.
|
|
Project No
|
GTC/07/146/ED
|
|
Type
|
EPIC
|
|
Title
|
Engineering, Procurement, Installation and Commissioning of Corrosion Inhibition
Facilities at the Wellheads with Gaslift, Dukhan
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
08/03/2010
|
|
Details
|
EPIC for the Creation of Corrosion Inhibition Facilities at Wellheads with Gaslift
- Dukhan. The objective of the work is to provide corrosion inhibitor injection
facilities for each individual Wellhead having Gas Lift facilities in order to protect
essentially the Wellhead casing, tubing and flowlines from corrosion.
|
|
Project No
|
GTC 06/133/ED
|
|
Type
|
EPIC
|
|
Title
|
Engineering, Procurement, Installation and Commissioning for the Replacement of
Halon System at Dukhan and Mesaieed
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
23/05/2009
|
|
Details
|
This is a EPIC Project to replace the Halon System in various locations, replace
existing Halon System in the turbine enclosure with Water Mist System, Installing
HSSD Systems and integrate the new system with existing F & G ESD Systems and with
DCS.
The project consists of site survey, design & engineering, procurement of materials,
civil & structural works such as trenching of road crossing, etc.; Instrumentation
works such as functional testing calibration, cabling, installation of instruments
etc; Electrical works such as cable laying, install MCBs, DBs, etc.; Loss Prevention
such as installation of HSSD panels, fire alarm system, etc.; DCS, ESD/F&G, HVAC,
etc,; testing, pre-commissioning and commissioning.
|
|
Project No
|
CT/RG27/L123/06
|
|
Type
|
EPIC
|
|
Title
|
Napthenic (Sulfidic) Caustic Injection Project
|
|
Client
|
RASGAS
|
|
Date of Completion
|
15/04/2008
|
|
Details
|
EPIC for the Sulfidic Caustic Injection Project at the Ras Laffan Site.
The project includes modifications and new works in various locations in and around
the LNG Plant and include works on Trains - 1, 2, 3, 4, 5 and AKG-1.
Site survey, detailed design engineering, procurement of caustic filtration package,
HCL acid dosing package, static inline mixer, pumps, tanks, pipes, valves, etc.
Construction of RCC roundation, structural steel supports, excavation, pavement,
asphalt road. Installation of caustic filtration unit, HCL acid dosing unit, static
inline mixer, etc. including all the electrical and instrumentation work. Precommissioning
and commissioning of all the equipment and instruments.
|
|
Project No
|
GTC 07/178/ED
|
|
Type
|
EPIC
|
|
Title
|
Engineering, Procurement, Installation and Commissioning for Replacement of V-2003
and Installation of Air Coolers at NGL-2 Mesaieed
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
31/05/2009
|
|
Details
|
Design and detailed engineering, procurement of all materials including glycol separators
V-2003 and iar coolers E-2410/S. The construction consists of earthworks, excavations,
concrete foundations, structural steel, fabrication and erection of access road,
transportation and erection of glycol separator and coolers, piping , cable laying,
installation of control / ESD panels, calibration and installation of field instrument,
installation of lighting and earthing system, installation of firewater monitors,
F&G detectors, F&G panels, hydrotesting, pre-commissioning / commissioning, part
shutdown, start-up and reliability test.
|
|
Project No
|
QIGOO1.4 (GASAL)
|
|
Type
|
EPIC
|
|
Title
|
Works and Services Contract Mesaieed 1 - Nitrogen Pipeline
|
|
Client
|
GASAL
|
|
Date of Completion
|
31/05/2009
|
|
Details
|
The project consists of installation services for laying the 14 Nitrogen Gas Pipeline
and its Control Stations.
The 14 Nitrogen Gas Pipeline is routed between Gasal Plant, located in QASCO premises,
and consumers QATAFIN and Q-CHEM II, located in Mesaieed Industrial City. The pipeline
is equipped with control stations at its export and receiving points with facility
for Pressure Control and Metering.
|
|
Project No
|
GTC 07/129/ED
|
|
Type
|
EPIC
|
|
Title
|
Engineering, Procurement, Installation and Commissioning of RAW NGL Facilities at
Wellhead DK-568
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
21/05/2008
|
|
Details
|
The project consists of Engineering, Procurement, Installation of new piping and
associated facilities to newly drilled injection well DK-568 and commissioning the
same to fulfill the design capacity in a safe manner. The works include site survey,
engineering, HAZOP, installation of concrete foundation, ESD valves, piping, instruments,
cabling, fencing, paint, pre-commissioning and commissioning.
|
|
Project No
|
MESAIEED I - ASU QIC1001.1
|
|
Type
|
Construction
|
|
Title
|
Construction and Commissioning of Nitrogen Plant
|
|
Client
|
AIR LIQUIDE
|
|
Date of Completion
|
31/12/2007
|
|
Details
|
The project is for the construction of a new air separation plant (nitrogen plant)
at Mesaieed which consists of site preparation, procurement of materials, fabrication
and erection of structural steel, installation of equipment shelters, installation
of heavy equipment, fabrication and erection of piping systems, installation of
instrumentation and electrical systems, painting, testing of all equipment and systems,
pre-commissioning and commissioning.
|
|
Project No
|
GTC/04/200/FSD
|
|
Type
|
MANPOWER
|
|
Title
|
Provision of Manpower for Dukhan Workshops on a Call-off Basis in the Dukhan Fields.
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
15/12/2008
|
|
Details
|
Provision for supply of Manpower for QP Workshops at Dukhan on a Call-off Basis.
|
|
Project No
|
3000007653
|
|
Type
|
Construction
|
|
Title
|
Construction / Installation of 18" & 12" Pipelines and Remedial Works
|
|
Client
|
Snamprogetti / Qatar Petroleum
|
|
Date of Completion
|
03/02/2008
|
|
Details
|
The project consists of the removal of defective internally corroded pipelines of
18" connecting KNDS and Jaleha to FNLGCPlant and 12" pipeline connecting Diyab manifold
to Jaleha production plant. The works consists of site survey, identification of
defective / corroded pipes / bends / spools as per the as-built weld map and PII
Integent Pigging Reports, removal and replacement of corroded pipes, valves, etc.,
internal cleaning, leak testing, functional tests, preservation and re-installation
of MOV etc., pre-commissioning and commissioning.
|
|
Project No
|
LTC 06/010
|
|
Type
|
Construction
|
|
Title
|
Replacement of Various Instrument Valves at Fahahil Stripping Plant in the Dukhan
Fields
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
29/04/2007
|
|
Details
|
The project consists of replacement of existing HVCs with bigger capacity valves
to increase RAG gas flow, replacement of PCVs with presure control loops on vessels
and pressure control to configure in DCS for auto and manual operation. The work
consists of engineering, procurement, construction of civil, structural, mechanical,
piping, instrumentation works including cable laying and termination, hydrotesting
etc. and pre-commissioning and commissioning.
|
|
Project No
|
KT-065
|
|
Type
|
Construction
|
|
Title
|
Installation of Buried 20" New Fuel Gas Pipeline (Ras Laffan B Combined Cycle Power
& Desalination).
|
|
Client
|
Siemens / Salam Petroleum / Qatar Petroleum
|
|
Date of Completion
|
10/01/2007
|
|
Details
|
The installation works consists of civil, mechanical, scraper traps / pigging, hydrotesting
including road crossing (thrustboring/tunneling) and DCVG survey.
|
|
Project No
|
GTC /05/162/ED
|
|
Type
|
EPIC
|
|
Title
|
Engineering, Procurement, Installation and Commissioning of Firewater Tank at Fahahil
Stripping Plant and Associated Deluge / Sprinkler System.
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
27/11/2006
|
|
Details
|
The scope of work consists of EPIC of Tank, Deluge Skids, Valves, Flame Detectors,
Flow meters, Control Valves, Cathodic Protection, etc. Also include the works such
as Site Survey, Earthworks, Tank Foundations, Excavations of Trenches, Road Crossings,
Sleeper Supports, Structural Steel Works, Testing, Calibration, Cable Laying, Lighting
System, Calibration of field instruments, F&G systems modification, DCS and other
Electrical & Instrumentation works.
|
|
Project No
|
GTC/04/194/ED
|
|
Type
|
EPIC
|
|
Title
|
Engineering, Procurement, Installation and Commissioning of New RAW NGL Injection
Facilities at FSP, Dukhan
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
15/09/2006
|
|
Details
|
This is a multidiscipline project for the installation of new Raw NGL Injection
pump & the demolition of existing one with all the related civil and E & I works.
|
|
Project No
|
LTC 04/018
|
|
Type
|
EPIC
|
|
Title
|
Engineering, Procurement, Installation and Commissioning of Upgrade of Instrumentation
at PWI 1, 4-9 Stations in the Dukhan Fields (PCR/03/030/D)
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
15/08/2006
|
|
Details
|
The scope of work consists of Site Survey, Updating of P & ID's, Updating of Specifications,
Datas Sheets, etc. Procurement of materials such a transmitters, PCS modifications
hardware, bulk instrumentations items, etc. The construction activities consists
of installation of new PCS hardware, modification of PCS hardware, installation
of new transmitters in the field, calibration of transmitters, installation of new
SS process tubing, cabling, etc.
|
|
Project No
|
LTC/06/001
|
|
Type
|
Construction
|
|
Title
|
Maintenance Shutdown Activities at Khuff A & B Station N Plants in Dukhan Fields
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
15/06/2006
|
|
Details
|
This Shutdown maintenance work of stations and plants consists of process shutdown
& isolation, decontamination of vessels, tanks & pigtraps, internal coating of equipments,
civil, mechanical, electrical & instrumentation works, rectification and re-installation
of valves & motors, nitrogen purging.
|
|
Project No
|
GTC/05/155/ED
|
|
Type
|
EPIC
|
|
Title
|
Engineering, Procurement, Installation and Commissioning of Propane Chillers E1104
A & B At FSP GTC/05/155/ED)
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
30/05/2006
|
|
Details
|
Project consists of Engineering, Procurement, Installation and Commissioning of
New Propane Chiller 2 No. at Fahahil stripping plant and associated Civil and E
& I works, each equipment weighing 45 tons of 20 meters long.
|
|
Project No
|
3000005458
|
|
Type
|
Construction
|
|
Title
|
Construction/Installation of 16" Pipeline from Diyab to Jaleha for Dukhan Field
Gas Lifting Project in Qatar
|
|
Client
|
Snamprogetti / Qatar Petroleum
|
|
Date of Completion
|
30/09/2005
|
|
Details
|
The work consisted of fabrication and laying of 16" pipeline and related works including
painting, hydrostatic testing, intelligent pigging and land restoration.
|
|
Project No
|
LTC 04/073
|
|
Type
|
EPIC
|
|
Title
|
Engineering, Procurement, Installation and Commissioning of New Air Compressor at
Dukhan Power Station
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
10/11/2005
|
|
Details
|
The project consists of Design and Detailed Engineering, Procurement, Construction
and Installation of Civil / Structural, Mechanical / Piping, Electrical / Instrumentation,
Testing / Commissioning and Project Dossiers. The scope include constuction of Building,
Compressor Foundation, Fabrication and erection of piping works, installation of
compressor, air receiver, dryer, cable laying, field lighting, field instruments
electrical panels, control system, etc.
|
|
Project No
|
GTC101/ED/04
|
|
Type
|
EPIC
|
|
Title
|
Engineering, Procurement, Installation and Commissioning of F&G Detection/ Protection
& Safety Upgrades in the Dukhan Fields
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
11/08/2005
|
|
Details
|
Engineering, Procurement, Installation and Commissioning for the F&G detection /protection
& safety upgrades in Dukhan fields- The project is a multidiscipline one aimed at
enhancing and upgrading the F &G Detection & safety systems in the Dukhan fields,
which includes New Fire Water Pumps, Tanks, Deluge Skids, and Associated Instrumentation
and Control Systems
|
|
Project No
|
GTC/187/ED/03
|
|
Type
|
EPIC
|
|
Title
|
Engineering, Procurement, Installation and Commissioning of New Instrument Air Compressor
Package at PWI Stations- Dukhan
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
29/12/2004
|
|
Details
|
The scope of work for Air compressor job shall include Design, Detailed engineering,
Procurement, Installation, Construction, Pre-commissioning, Commissioning and testing
of Instrument Air Compressors at PWI stations PS-1,4,5,6,7,8,9. The air compressors
shall be skid mounted, oil injected, rotary screw type units with local compressor
control panel, shall be installed at various location in the Dukhan field. The new
units shall be integrated with the existing Instrument air systems, process control
and shutdown systems, and are designed to maintain high availability of instrument
air.
|
|
Project No
|
LTC/142/03
|
|
Type
|
EPIC
|
|
Title
|
Engineering, Procurement, Installation and Commissioning of Supply & Installation
of a New Standby Generator System to Dukhan Jabel Telecoms Room
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
08/03/2005
|
|
Details
|
Engineering, Procurement, Installation and Commissioning of Supply & Installation
of a New Standby Generator to Dukhan Jabel Telecoms Room including Instrumentation
and Cabling works..etc
|
|
Project No
|
LTC/24/2002
|
|
Type
|
EPIC
|
|
Title
|
Engineering, Procurement, Installation and Commissioning of Supply, Installation
& Commissioning of a Diesel Driven Pump with necessary Modifications at Shahaniya
Stations for the Reverse Pumping of Water to Dukhan Through an Existing Pipeline.
|
|
Client
|
KAHRAMAA
|
|
Date of Completion
|
25/04/2004
|
|
Details
|
To install a Skid mounted Diesel Engine driven Centrifugal Pump with all accessories
at Shahaniya Pumping Station to reverse pump approximately One million Imp. Gallons
per day (1.0 MIGPD) of potable water from Shahaniya station to QP-Dukhan storage
tanks on emergency basis by using the existing 300mm/400 mm/200mm main between Shahaniya
and QP-Dukhan Storage tanks with necessary interconnection to the pipe lines with
all Electrical and Instrumentation works.
|
|
Project No
|
LTC/149/02
|
|
Type
|
EPIC
|
|
Title
|
Engineering, Procurement, Installation and Commissioning of Replacement of 12" Fuel
Gas Line from KMDHS to KMDGS in Dukhan Fields
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
15/02/2004
|
|
Details
|
Project consists of Complete replacement of existing 12" Gas Pipeline (approx 900
Mtr) including Tie-in and associated Electrical & Instrumentation Works.
|
|
Project No
|
LTC/004/02/VO1
|
|
Type
|
EPIC
|
|
Title
|
Engineering, Procurement, Installation and Commissioning of 4 Khuff Fuel Gas Pipeline
to Khatiyah South (Variation No. 1 to LTC/004/02)
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
2003
|
|
Details
|
Projects consists of Engineering, Procurement, Construction, Installation, Testing
& Commissioning of 4" Fuel Gas Pipeline from existing 6" Khuff Gas Line of KSDS.
The work consists of Civil, Mechanical, Pipeline, Piping, Instrument & Control,
Electrical, Precommissioning and Commissioning.
|
|
Project No
|
LTC/004/02
|
|
Type
|
EPIC
|
|
Title
|
Engineering, Procurement, Installation and Commissioning of 4 and 6 Fuel Gas Pipeline
to QNCC and Desalination Plant-Dukhan
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
2003
|
|
Details
|
Projects consists of Engineering, Procurement, Construction, Installation, Testing
& Commissioning of 6" Fuel Gas Pipeline from JDS & QNCC-1 and 4" Pipeline to QNCC
Desalination Plant. The works include Civil, Mechanical, Pipeline, Piping, Instrument
& Control, Electrical, Precommissioning and Commissioning.
|
|
Project No
|
GTC/118/2000
|
|
Type
|
EPIC
|
|
Title
|
Engineering, Procurement, Installation & Commissioning of Dukhan Flare Upgrade Project
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
2002
|
|
Details
|
Project consists of Engineering, Procurement, Construction, Installation, Testing
and Comissionng of Flare Upgrade Project involving 6 process flare & 4 tank flares,
fabrication, K.O. Drum, Pumps, Blowers, ESD Valves, MCC Building Pipeline works
of 42", 36", 30" & 24" for 2 km, 3 km, & 4 km, Associated Equipment, Electrical,
Instrument and Control System works.
|
|
Project No
|
GTC/151/2000
|
|
Type
|
EPIC
|
|
Title
|
Engineering, Procurement, Installation and Commissioning of 30 Gas Pipeline Replacement
from Point W1 to W2 Ras Abu Fontas & Auxiliary Gas Supply to RAF B1
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
2002
|
|
Details
|
Engineering, Procurement, Construction, Installation, Testing and Commissioning
of New Buried 30" Gas Pipeline from Station W1 to Station W2, including all Civil
works, Mechanical / Piping and Two Pig Launching / Receiving Station, Fabrication
and Erecton Structural steel works and associated Electrical, Instrumentation and
F&G works.
|
|
Project No
|
GTC/143/EM/02
|
|
Type
|
Construction
|
|
Title
|
NFGP/AGRU/SRU Modification Works to Meet NGL-4 Project Feed Gas Requirements
|
|
Client
|
PETROFAC
|
|
Date of Completion
|
2002
|
|
Details
|
AGRU/SRU Sea Water Upgrade Project in NGL was a Fast Track Project which include
Enginering, Procurement, Construction and Comissioning. The project was to Upgrade
Sea Water Headers from Cement Lined to GRE Piping , Installation of new equipment
such as Sea Water Fillters, Dry Gas Coolers and Instrumentation. The scope includes
Carbon Steel Heavy Wall Piping, GRE Pipeline & Piping, Cement Lined Piping Modification,
Tie-ins and related Civil, Strucutural, Trecnhing and works inside Live Plants of
NGL Mesaieed. The works include Electrical, Instrumentation and Control Systems.
Total of 220,000 Manhours spended in 2.5 Months.
|
|
Project No
|
GTC/197/ED/01
|
|
Type
|
EPIC
|
|
Title
|
Engineering, Procurement and Construction of 12 Pipeline for Arab-D Condensate
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
2002
|
|
Details
|
Engineering, Procurement, Installation and Commissioning of approximately 3 km 12"
pipeline including All Fabrication works related to the construction of 12" Pipeline,
Structural Steel works etc. It was a Fast Track Project
|
|
Project No
|
GTC/124/01
|
|
Type
|
Construction
|
|
Title
|
Rehabilitation of Crude Oil Tanks QJA-1 and QJA-24 in the Dukhan Field Area
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
2001
|
|
Details
|
Work Consiste of fabrication, installation and testing of replacement parts of the
Tank including structural members , Tank Calibration, Testing and Commissioning
of the existing crude oil storage Tank
|
|
Project No
|
LTC/013/00
|
|
Type
|
Construction
|
|
Title
|
Construction of Diyab Enhanced Oil Recovery (EOR) Pilot Test Arab "D" Dukhan
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
2001
|
|
Details
|
All work\s Related to Fabrication, laying, Welding, NDT, Hydrotestng, etc. including
all associated structural steel supports and platforms of Pipng Structural Steel
works
|
|
Project No
|
LTC/028/00
|
|
Type
|
Construction
|
|
Title
|
Construction of 6" Khuff Gas Feed Buried Pipeine to Dukhan Power Stations in the
Dukhan Fields Area
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
2001
|
|
Details
|
Fabrication, laying, welding , NDT, Hydrotesing of pipeline , including all required
support sleepers, Pig launching,receiving station etc.
|
|
Project No
|
LTC/016/00
|
|
Type
|
Construction
|
|
Title
|
Plant Shutdown works at Various Degassing Stations in the Dukhan Fields Area
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
2000
|
|
Details
|
Maintiance and repair works of various Sections of the Plant, cleaning, re-assembly
of vessel & Replacement of parts etc. during shutdown. Including related Electrical
& Instrumentation maintenance works.
|
|
Project No
|
GTC 110/97
|
|
Type
|
Construction
|
|
Title
|
Construction, Installation and Hook-up of PWI Spurlines and Oil Flowlines in Dukhan
Fields (1997-1999 Programme)
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
2000
|
|
Details
|
Fabrication, laying, welding , NDT, Hydrotesing of pipeline (12", 10" & 6") , including
all required support sleepers, Pig launching,receiving station etc. Including related
Instrumentation and Control Systems for approx. 100 km.
|
|
Project No
|
LTC/086/98
|
|
Type
|
EPIC
|
|
Title
|
Engineering, Procurement, Installation and Commissioning of Point W 2 Station
Low Flow Pressure Letdown Facility , at Ras Abu Fontas
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
1999
|
|
Details
|
Engineering, Procurement, Installation and Commissioning of 30" Gas Pipeline approx.
5 km including Fabrication works of Plant Piping, related Structural Steel works,
Electrical and instrumentation works, etc.
|
|
Project No
|
LTC/278/97
|
|
Type
|
Construction
|
|
Title
|
Isolation MOVS for Crude Oil Incoming Line to Terminal and Provision of Actuator
for Existing Manual Valves, Mesaieed
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
1999
|
|
Details
|
Automation of existing manual valves including procurement and supply, fabricaton
of necessary parts and installation of nescsary control system in the crude oil
loading terminal at Mesaieed.
|
|
Project No
|
LTC/182/98
|
|
Type
|
EPIC
|
|
Title
|
Procurement and Installation of Knockout Pot for Fuel Gas Treatment in the Dukhan
Power Station
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
1999
|
|
Details
|
Procurement, supply, Installation, testing and commissioning of Knock out pot and
fabrication and erecton of associated piping/structural work for fuel gas treatment
in dukhan power station
|
|
Project No
|
LTC/258/98
|
|
Type
|
Construction
|
|
Title
|
Plant Shutdown works at Khuff B C & D Plant in the Dukhan Fields Area
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
1999
|
|
Details
|
Overhauling, servicing, testing, commissioning and strat-up of plants during shutdown
and Manpower Support service
|
|
Project No
|
LTC/173/98
|
|
Type
|
Construction
|
|
Title
|
Replacement of 30 Khuff Gas Pipeline from Point N to B in the Dukhan Fields
Area
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
1999
|
|
Details
|
Inspection, replacement of corroded section of existing pipelines, NDT, Hydrotesing
and commissioning, of existing 30" Khuff Gas Pipeline with related instrumentation
works.
|
|
Project No
|
GTC/198
|
|
Type
|
Construction
|
|
Title
|
Replacement of 30" Khuff Gas Pipeline Point K-1-N
|
|
Client
|
ZAKHEM International
|
|
Date of Completion
|
1999
|
|
Details
|
Replacement of 30" Khuff Gas Pipeline Point K1-N.
|
|
Project No
|
ARAB - D
|
|
Type
|
Construction
|
|
Title
|
Dukhan Arab D Gas Recycling Project Maintenance Works-Dukhan
|
|
Client
|
BROWN & ROOT
|
|
Date of Completion
|
1999
|
|
Details
|
Modification works to Piping, Structural Steel, E & I and Control Systems Works
during Maintenace Period of the Arab-D Plant At Dukhan
|
|
Project No
|
GTC/107/96
|
|
Type
|
Construction
|
|
Title
|
Dukhan Arab D Gas Recycling ProjectPart:Headers/flowlines/ Wellhead/ Waterlines
/ Civil Works
|
|
Client
|
HDEC / B&R / QGPC
|
|
Date of Completion
|
1998
|
|
Details
|
Fabrication, Laying, welding, NDT various spurlines, including Hydrotesing & commissioning
for Arab-D Plant Construction including 24", 8" & 2" pipeline for 45 km, 25 km &
60 km.
|
|
Project No
|
GTC/113/97
|
|
Type
|
Construction
|
|
Title
|
Rehabilitation of Crude Oil Storage Tanks QJA-22/23 at Khatiyah and QJA 25/26 at
JDS-Dukhan
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
1998
|
|
Details
|
Work Consists of fabrication, installation and testing of replacement parts of the
Tank including structural steel , Tank Calibration, Testing and Commissioning of
the existing crude oil storage Tank
|
|
Project No
|
LTC/155/97
|
|
Type
|
Construction
|
|
Title
|
Potable Water Supply to Bir Zekrit Village and Army Post-Dukhan
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
1998
|
|
Details
|
Project consists of Enginering, Material Procurement, Fabrication, laying, Welding,
NDT, Installation and testing of Potable water pipeline, hydrotesting, pigging ,
structural steel supports, precasting concrete sleepers.
|
|
Project No
|
LTC/065/98
|
|
Type
|
Construction
|
|
Title
|
Plant Shutdown works at Khatiyah and Fahahil Stations in the Dukhan Field DUKHAN
AND DOHA OFFICE
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
1998
|
|
Details
|
Work Consiste of fabrication, installation and testing of replacement parts of the
Tank including structural steel , Tank Calibration, Testing and Commissioning of
the existing crude oil storage Tank with related electrical / instrumentation maintenance
works.
|
|
Project No
|
LTC001/98
|
|
Type
|
Construction
|
|
Title
|
Plant Shutdown works at Khuff E and G in the Dukhan Fields Area DUKHAN AND DOHA
OFFICE
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
1998
|
|
Details
|
Work Consiste of fabrication, installation and testing of replacement parts of the
Tank including structural steel , Tank Calibration, Testing and Commissioning of
the existing crude oil storage Tank
|
|
Project No
|
GTC/102/96
|
|
Type
|
EPIC
|
|
Title
|
Engineering, Procurement and Construction of Oil Flowlines and Wellhead Dukhan
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
1997
|
|
Details
|
Fabrication, laying, welding , NDT, Hydrotesing of pipeline , including all required
support sleepers, Pig launching,receiving station with related electrical & instrumentation
works.
|
|
Project No
|
GTC/160/95
|
|
Type
|
EPIC
|
|
Title
|
Engineering, Procurement, Installation and Commissioning of Cathodic Protection
System upgrade (Pipelines) Dukhan
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
1997
|
|
Details
|
This project which was executed on turnkey EPIC basis, comprised of Detailed Engineering,
Procurement, Installation and Commissioning of Impressed Current Cathodic Protection
System for 301 KM of underground Oil & Gas Pipeline - network, scattered from Doha
to Dukhan, Dukhan to Umm Bab and Umm Bab to Point B near Mile 42. This included
30 gas lines (64 KM), 24 gas line (38 KM), 20 gasline (41 KM), 18 gasline (32
KM), 16 gas line (18KM), 12 condensate line (42 KM) and 10 oil line (66KM), with
associated Electrical, Instrumentation and Control Systems.
|
|
Project No
|
GTC/145/95
|
|
Type
|
EPIC
|
|
Title
|
Engineering, Construction of Oil flowlines and Wellheads Piping Upgrade Dukhan
fields, 1995 Programme-Dukhan
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
1996
|
|
Details
|
Fabrication, laying, welding , NDT, Hydrotesing of pipeline , including all required
support sleepers, Pig launching,receiving station etc. with related E & I works.
|
|
Project No
|
GTC/152/95
|
|
Type
|
Construction
|
|
Title
|
Rehabilitation of Crude Oil Storage Tanks QJA-3,4,22 & 23 at Fahahil and Khatiyah
main Stations-Dukhan.
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
1996
|
|
Details
|
Work Consists of fabrication, installation and testing of replacement parts of the
Tank including structural steel , Tank Calibration, Testing and Commissioning of
the existing crude oil storage Tank
|
|
Project No
|
CC/181/95
|
|
Type
|
EPIC
|
|
Title
|
EPIC works related to Improving Water disposal Facilities at Khatiyah main & Fahahil
main Degassing Stations and Routing of Produced Water to Disposal Well at the Khatiyah
North Degassing Station
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
1996
|
|
Details
|
EPIC works related to Improving Water disposal Facilities at Khatiyah main & Fahahil
main Degassing Stations and Routing of Produced Water to Disposal Well at the Khatiyah
North Degassing Station including related electrical / instrumentation and control
systems works.
|
|
Project No
|
CC/186/95
|
|
Type
|
Construction
|
|
Title
|
Replacement of Suction Strainers and Recirculation Lines at PWI Pump Stations At
Dukhan
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
1996
|
|
Details
|
Fabrication, laying, welding , NDT, Hydrotesing of pipeline , including all required
support sleepers, Pig launching,receiving station etc.
|
|
Project No
|
GTC112/95
|
|
Type
|
Construction
|
|
Title
|
Installation of Powered Water Injection (PWI) Spurlines Dukhan 1995 Programme
Dukhan
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
1996
|
|
Details
|
Fabrication, laying, welding , NDT, Hydrotesing of pipeline , including all required
support sleepers, Pig launching,receiving station etc. with related electrical and
instrumentation works.
|
|
Project No
|
LTC/067/96
|
|
Type
|
Construction
|
|
Title
|
Emergency Remedial works 30 Khuff gas Line at Point N in the Dukhan Fields Area
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
1996
|
|
Details
|
Fabrication, laying, welding , NDT, Hydrotesing of pipeline , including all required
support sleepers
|
|
Project No
|
CC/180/95
|
|
Type
|
Construction
|
|
Title
|
Vessel Inspection and Mechanical Related works at Khuff Plants H and L in the
Dukhan Field Area
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
1996
|
|
Details
|
Overhauling, servicing, testing, commissioning and strat-up of plants during shutdown
and Manpower Support service
|
|
Project No
|
CC/194/95
|
|
Type
|
Construction
|
|
Title
|
Vessle Inspection and Mech. Related works at the Jleha Dehydration Mol-Sieve & Umm
Bab Booster Stations in the Dukhan Fields Area
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
1995
|
|
Details
|
Overhauling, servicing, testing, commissioning and strat-up of plants during shutdown
and Manpower Support service
|
|
Project No
|
CC/171/95
|
|
Type
|
Construction
|
|
Title
|
Engineering Procurement and Constr. Of 4" Potable Water Line Replacement, Sinnah-
Dukhan
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
1995
|
|
Details
|
Project consists of Enginering, Material Procurement, Fabrication, laying, Welding,
NDT, Installation and testing of Potable water pipeline, hydrotesting, pigging ,
structural steel supports, precasting concrete sleepers and related E & I works.
|
|
Project No
|
CC/010/95
|
|
Type
|
Construction
|
|
Title
|
Construction & Hook-up of Oil Flowlines Dukhan Fields 1995 Programme Phase I
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
1995
|
|
Details
|
Fabrication, laying, welding , NDT, Hydrotesing of pipeline , including all required
support sleepers, Pig launching,receiving station etc.
|
|
Project No
|
CC/049/95
|
|
Type
|
Construction
|
|
Title
|
Upgrade Wellhead Facility at Dukhan field Safety Survey
|
|
Client
|
Qatar Petroleum
|
|
Date of Completion
|
1995
|
|
Details
|
Survey of Dukan Wellhead Facility
|